Die Kraft der strategischen Planung: ein Fahrplan zum Erfolg

EULYNX in Use - CSA Field Elements as Part of the DB Demonstrator

Client:

DB

Date:

Apr 8, 2022

As part of the "Moving Block Demonstrator" project in the Digital Test Field Railway (Erzgebirge), CSA Engineering has realized a proof of concept of the EULYNX Object Controller for specific field tests by Deutsche Bahn.
Our field elements allow testing and further developing the new interlocking technology under real-world conditions.

More about this in the official article by Deutsche Bahn:
Driving in the "Moving Block" – Digital Rail Germany begins field tests in the Erzgebirge

Die Bedeutung guter Führung in einem wachsenden Unternehmen
Die Bedeutung guter Führung in einem wachsenden Unternehmen
Die Bedeutung guter Führung in einem wachsenden Unternehmen

Field Element of the EULYNX PoC Platform

Client:

SBB

Date:

Mar 15, 2022

The platform is deployed at the Löwenberg test facility near Murten and enables practical verification of EULYNX-compliant systems under realistic conditions.

Wachstum freischalten: Strategien zur Skalierung Ihres Unternehmens
Wachstum freischalten: Strategien zur Skalierung Ihres Unternehmens
Wachstum freischalten: Strategien zur Skalierung Ihres Unternehmens

RaSTA Protocol Stack

Client:

SBB

Date:

Feb 28, 2022

The advancing digitalization in the railway sector presents new challenges for infrastructure operators. Particularly, the integration and communication between different systems impose high demands on safety and efficiency.